DESCRIPTION:
This project included a prototypical 3-Bay Grease Monkey. Part of an larger retail center, both buildings were situated on only 1/2 acre.
The design incorporated materials and themes of the overall shopping center. Construction materials, such as the textured CMU and detailed cornices provided both interesting and functional articulation.

Project Data:
Site Area: 44,820 SF (1.03 Acres)
Building Area: 2,160 SF
Construction Materials:
Masonry and steel
Asphalt shingles

Structural Engineer:
Kirkham Michael
MEP Engineer:
J.J. Blank Engineering
Electrical Engineer:
Alber Engineering
Civil Engineer:
inSite Engineering
|