DESCRIPTION:
McClure Concrete's new facility in Aurora included the construction of a 1-story administrative building and a 1-story warehouse. The project was designed to be constructed in phases, allowing the use of the warehouse prior to the occupancy of the administrative offices.
The administrative buidling incorporates the use of brick veneer with a carefully detailed E.I.F.S. design.
The warehouse builidng is a metal building with brick veneer to match the finished appearance of the administrative offices.
Project Data:
Site Area: 116,371 SF (2.67 Acres)
Building Area: 3,725 SF
Construction Materials:
Wood and steel frame constructions
Brick veneer
E.I.F.S.
Metal siding
Concrete tile roofing
Structural Engineer:
JEI, Co
MEP Engineer:
Engineering Design Services
Electrical Engineer:
Alber Engineering
Civil Engineer:
Highline Engineering & Surveying
|